Selected Major Works

SIPCHEM / UHDE THYSSENKRUPP Civil-structural & Mechanical Contracts

Civil Construction , Fabrication and Erection of Pipes, Equipment and Steel structures, including platforms, stairs, ladders, railings and Mechanical installation of Inline instruments - Refractory and Testing

PETRO RABIGH Radiant Coil Replacement Project

Supply, Fabrication and Installation of 8 Furnaces by our JV partner Schmidt + Clemens NDT including 100% Radiography Testing , Commisioning and Handover in record time

OMAN METHANOL CO (OMC)

Replacement of 15 nos. outlet manifold headers together with Reducer and In-liner and 840 nos. reformer tubes in M1-BA 201 Reformer at OMC- Oman

SAIPEM / ARAMCO - KHURAIS Crude Project

The Scope of work involved GOSP (Gas and Oil Seperation Plants) 1, 2, 3 & 4 (Incl. Foundations and Pipe Racks) Mechanical Piping Fabrication, Testing & Precommisioning Unpacking, Installation & Alignment of Rotating & Static Equipment incl. heavy lift & shift

TABUK CEMENT COMPANY THYSSENKRUP POLYSIUS

Construction of the Cement Mill , Oil Receiving Station, Clinker, Grinding Mill and Packing Plant consisting of three new packing lines at the Tabuk Cement Co. – Duba, Tabuk – K.S.A.

SAUDI ARAMCO

Field Fabrication and Installation of Piping on the Overhead Pipe racks at GOSP-1,2,3, ATM (WBS 5), TEG and GAS (WBS 4) area in Saudi Aramco Manifa Core Hydro Carbon Project. Contract with SAIPEM/SNAMPROGETTI company.

SAUDI ARAMCO

Field Fabrication and Installation of Piping on the Overhead Pipe racks at GOSP-1,2,3, ATM (WBS 5), TEG and GAS (WBS 4) area in Saudi Aramco Manifa Core Hydro Carbon Project. Contract with SAIPEM/SNAMPROGETTI company.

SABIC / AL-BAYRONI Shutdown Contract

Al-Bayroni Turnaround 2009-Reformer Re - tubing work (88nos of 4” Tubes With 1.5” pigtails joints) Planned Duration - 18 days GS Execution - 7 days

SATROP/ DAYIM PUNJ LLOYD

Pipe Fabrication and NDT Services at Global Sources Fabshop Quantity: 85,000 dia inch

KHURAIS CRUDE CONTRACT WITH SAIPEM

This project was carried out in conjunction with Saipem /Snamprogetti Construction Company. The primary task involved were for GOSP 1, 2, 3 & 4 (Gas and Oil Separations Plant(s) including foundations and pipe racks.

FARABI PETROCHEMICALS Lab Expansion

All construction works with LAB (Linear Alkaline Benzene) Expansion Project, including, inter alia; Civil, Structural, underground utilities, above ground piping, Architectural and civil work(s) for the buildings, Paving and Road work(s), Shaded Car Parking, HVAC work(s) and Electrical and Instrumentation Work(s)